Capacity register and FAR procedure
Procedures for Supply Point Capacity calculation.
Calculating Supply Point Capacity
The Transporter is required to reappraise and revise the Supply Point Capacity (SPC) in respect of each supply point annually in advance of the gas year. Please see below for links to the procedure which governs the calculation of SPC for Large Daily Metered (LDM), Daily Metered (DM) and Non Daily Metered (NDM) supply points. In conjunction with the Code of Operations, procedures are in place that governs forecasting demand at gas points, determining allocations by the transporter and for the reconciliation process.