Congestion Management Procedure

 

Annex 1 of EC Regulation 715/2009 as introduced by Commission Decision of 24 August 2012, it is required that Congestion Management Procedures (CMP) be put in place between entry-exit systems, irrespective of whether they are physical or virtual between two or more member states or within the same member state where the points are subject to booking procedures by users.

Gas Networks Ireland introduced CMP into the Code of Operations via Code Modification A067 in 2015.

Section 2(A) - Contractual Congestion of Part H (Operations) of the Code of Operations was introduced by the Code Modification A067.