New Towns

Current Projects

Nenagh Town

Ervia is currently undertaking a €17 million infrastructure project in Nenagh to bring gas to the town for the first time, along with upgrading the existing water and wastewater systems.

The overall project consists of 40km of gas pipelines, 4km of water mains and 1.5km of waste water mains. Work on this project is expected to be complete in 2018. ​

Download brochure on Nenagh Project

Wexford Town

Bringing gas to Wexford town is taking place in two phases, the first involved constructing gas mains from Great Island to the edge of Wexford town and the second consists of laying pipes around the town.

The next phase of this project is due to begin in mid-2018 and involves the construction of a further 10km of gas mains in the town, as well as the replacement of approximately 11.6km of aging water mains which are in poor condition, most of which run alongside the route of the gas pipeline.

It will also include the replacement of over 1,000 lead shared backyard services. It is expected that this work will take circa 12 months to complete. The site investigation works to assist with the design of Phase 2 have been running in parallel with the Phase 1 pipe laying works and are now complete.


The Gas to Listowel project encompasses a Feeder Main gas pipeline which will run from an existing Gas Networks Ireland station near Foynes, Co. Limerick through to Listowel town; and a Gas Distribution Network within Listowel town. This work is taking place in two distinct phases. Gas Networks Ireland is engaging with landowners, stakeholders, residents, businesses and relevant authorities in the area before commencing construction.

The project will see a 41km gas Feeder Main pipeline laid from Barrigone, Co Limerick to Listowel town. The route travels via Ballyhahill, Co Limerick and Moyvane, Co Kerry, with local gas distribution networks being constructed in each of these locations. Work on the Feeder Main will be followed by the delivery of 9kms of local town gas distribution network in Listowel town.

Download brochure on Listowel Project

Gas to Center Parcs

Work to deliver natural gas to the Center Parcs site in Ballymahon, County Longford commenced in January 2018.  Comprising 27km of pipeline in total, the project will be delivered in two sections.
Section one, measuring 6kms in length, runs from Rathmore, Co Longford along the N55 into Ballymahon and then along the R392 to the Center Parcs site.  Site investigations are currently underway and pipe laying along the R392 begins in February 2018.   Section two, measuring 21kms in length, runs via regional and local roads from Ories to Tang, in County Westmeath and then along the N55 connecting to section 1 in Rathmore.  

Towns Connected as part of New Towns Phase 3

• Kinsale, Co. Cork
• Tipperary Town, Co. Tipperary 
• Kells, Co. Meath
Also Connected:
• Macroom, Co. Cork
• Cootehill, Co. Cavan
• Tuam, Co. Galway 
Towns that were not proven viable, under the criteria set out by the Commission for Regulation of Utilities, will be kept under review.