Maintenance
Transmission System Maintenance
In accordance with its licences and the Code of Operations, Gas Networks Ireland is responsible for the operation, maintenance and repair of the sytem.
In accordance with Part G - Technical of the Code of Operations, Gas Networks Ireland must publish its Maintenance Programme. The table below shows the dates selected that are likely to affect Entry Points.
Revisions to the programme may be made in accordance with the Code of Operation and shall be communicated to industry should such revisions occur.
Maintenance Programme - Gas Year 2017/2018
Date | Duration | Entry Points | Commentary |
---|---|---|---|
7th Feb 2018 | 1 day | Bellanaboy | Not required |
1 day | Inch | Not required | |
31st May 2018 - 1st June 2018 | 2 day | Bellanaboy | SCADA signal validation and testing |
9th May 2018 | 1 day | Inch | In-line Inspection (ILI) run between Inch, Lochcarrig Lodge and Caherlag. Date to be finalised with pigging contractor. Odorant tank refill at Inch. Zero flow whilst this takes place. |
4th July 2018 | 1 day | Bellanaboy | Fuel skid connection at Cappagh South. May not affect flow |
1 day | Inch | Scope to be confirmed | |
12th Sept 2018 | 1 day | Bellanaboy | Scope to be confirmed |
1 day | Inch | Scope to be confirmed |